Fiscalization of a 12MWe photovoltaic plant (UPAC) for self-consumption at Alhandra Cement Plant, using the quarry space.
SCOPE: Fiscalization of Installation
CLIENT: CIMPOR
LOCATION: Alhandra
DATE: January 2024
Site Fiscalization and Owners Engineer for a Waste Heat Recovery (WHR) System to be integrated in an existing production line at Centro de Produção de Alhandra (CPA).
SCOPE: Site Management & Owners Engineer
CLIENT: CIMPOR
LOCATION: Alhandra
DATE: January 2024
Engineering for the replacement of Air Dryers in Temane Plant, Mozambique. Definition of Tie-In Points, evaluation of existing shelters and validation of existing foundations for the new set.
SCOPE: Site Engineering
CLIENT: SASOL
LOCATION: Mozambique
DATE: December 2023
Fermenters for microalgae facilities, for two fermenters, 1x 300L & 1x 650L capacity. Detail design and fabrication drawings, including platforms and accesses.
SCOPE: Detail Engineering and fabrication design.
CLIENT: PROTINEXT
LOCATION: The Netherlands
DATE: Novembro 2023
Power Industry batteries plant for grid supply stability under a scenario of future intermittent renewable power generation (wind and photovoltaics), peak shaving, black start, and grid forming, among other.
SCOPE: Conceptual Engineering
CLIENT: CS Energia
LOCATION: Palmela
DATE: November 2023
Design and Engineering of a reconversion clinker feeding system, alternating between 600 tons/day of clay and 600 tons/day of white clinker, at Pataias Production Plant.
SCOPE: Design and Detail Engineering.
CLIENT: SECIL
LOCATION: Pataias
DATE: November 2023
Supporting main contractor in Controlling progress activities of subcontractors, while monitoring the overall Project Time Schedule for “Geen Zinc Project – Odda 4.0”.
SCOPE: Project Planning and Control
CLIENT: MECWIDE
LOCATION: Norway
DATE: October 2023
Survey of a cement loading and unloading Port, by means of laser scan, topography and drone, to update all existing technical documentation to reflect the current status of the Port.
SCOPE: Infrastructures Surveying
CLIENT: CIMPOR
LOCATION: Viana do Castelo
DATE: October 2023
Site Fiscalization and Owners Engineer for a Waste Heat Recovery (WHR) System to be integrated in an existing production line at Centro de Produção de Souselas (CPS).
SCOPE: Site Management & Owners Engineer
CLIENT: CIMPOR
LOCATION: Souselas
DATE: September 2023
Definition of supporting structure and pipe routing for a NaOH Cyclone, including piping stress analysis, new supporting definition and structural steel dimensioning.
SCOPE: Design & Detail Engineering
CLIENT: The NAVIGATOR Company
LOCATION: Setúbal
DATE: September 2023
Data Center construction, supporting main contractor in Controlling progress activities of subcontractors, while monitoring the overall Project Time Schedule.
SCOPE: Project Planning and Control
CLIENT: CME- Construção e Manutenção Eletromecânica, S.A.
LOCATION: Sines
DATE: September 2023
Licencing project of the Upgrade of a Kiln Production Line, consisting new raw mill, preheater and kiln cooling system. The main purpose of this upgrade is to reduce CO2 emissions and to turn the production of clinker more efficient.
SCOPE: Conceptual and Licencing Engineering
CLIENT: CIMPOR
LOCATION: Alhandra
DATE: July 2023
Cement industry Waste Heat Recovery (WHR) rerouting and supports design of existing infrastructure layout paths: industrial water, sewage, rain water, earthing system, coal line, and fuel oil lines.
SCOPE: Detail Engineering
CLIENT: CIMPOR
LOCATION: Souselas
DATE: September 2022
Power Industry batteries plant for grid supply stability under a scenario of future intermittent renewable power generation (wind and photovoltaics), peak shaving, black start, and grid forming, among other.
SCOPE: Conceptual Engineering
CLIENT: CS Energia
LOCATION: Caldas da Rainha
DATE: September 2022
Cement Industry Ferrous Sulphate Silo excessive apparent displacements and deformation quantification.
Laser Scan, drone and topography survey for a 3D modelling to identify and advise severity of the Silo integrity.
SCOPE: Damage Technical Audit
CLIENT: CIMPOR
LOCATION: Souselas
DATE: September 2022
Updating existing drawings, recording all and any modification to industrial water, sewage, rainwater, fire fighting water, compressed air and glue supply system.
SCOPE: Infrastructures Surveying
CLIENT: SACOPOR, S.A.
LOCATION: Alenquer
DATE: June 2022
Industrial Roof of 1000m² design, engineering and licencing. Storage hall to harbour filled cement big bags.
SCOPE: Municipality Permitting and Construction Engineering
CLIENT: SACOPOR, S.A.
LOCATION: Alenquer
DATE: July 2022
Engineering revamp of Kiln burner, adapting the fuel supply, RDF and petcoke to accommodate a new burner generation. Revise existing structure for the trolley loads.
SCOPE: Engineering Verification
CLIENT: CIMPOR
LOCATION: Souselas
DATE: September 2022
Cement industry 3D modelling of new project to determine deviations using point-cloud technology.
SCOPE: 3D Deviations Survey
CLIENT: CIMPOR
LOCATION: Alhandra
DATE: April 2022
Mine industrial improvements, whilst scheduling, controlling and follow up, of ongoing projects.
SCOPE: Planning and Control Services
CLIENT: SOMINCOR
LOCATION: Castro Verde
DATE: June 2022
Concept, CAPEX evaluation, and technical tendering documentation to replace existing fuel oil system by a new and improved system.
SCOPE: Conceptual & Basic Engineering
CLIENT: CIMPOR
LOCATION: Souselas
DATE: June 2022
Licensing, permitting and basic engineering process of a new Waste Heat Recovery (WHR) facility to be installed at Alhandra Cement Plant.
SCOPE: Municipality Permitting and Licensing Engineering
CLIENT: CIMPOR
LOCATION: Alhandra
DATE: April 2022
Hopper redesign to handle ashes including CAPEX Evaluation to replace the existing solution.
SCOPE: Conceptual design and CAPEX Estimation
CLIENT: SECIL
LOCATION: Maceira
DATE: April 2022
Fiscalization of a 1MWe photovoltaic plant (UPAC) for self-consumption at Souselas Cement Plant.
SCOPE: Fiscalization of Installation
CLIENT: CIMPOR
LOCATION: Souselas
DATE: April 2022
Concept engineering of a Lime Kiln for SECIL’s Pataias Production Center to evaluate CAPEX viability of the project for Board Presentation.
SCOPE: Basic and Concept Engineering
CLIENT: SECIL
LOCATION: Pataias
DATE: September 2021
Tank calculation and detail design for White Bleach Storage tanks at pulp mill. 3D Survey of existing “Brownfield” to validate the technical viability of two new storage tanks.
SCOPE: Design and Detail Engineering
CLIENT: The NAVIGATOR Company
LOCATION: Setubal
DATE: November 2021
Commissioning Management at Neves Corvo Mine for ZEP (Zink Expantion Project) scope of works at mine surface. Coordination of contractors and O&M Suppliers.
SCOPE: Commissioning Management
CLIENT: SOMINCOR
LOCATION: Castro Verde
DATE: December 2021
Piping and engineering support on site of the revamping of process production systems. Site supervision and subcontractor management within the scope.
SCOPE: Engineering Site Supervision
CLIENT: HOVIONE
LOCATION: Loures
DATE: April 2021
Site supervision and subcontractor Management of a Gas Reduction and Metering Station to be executed in a “Brownfield” area .
SCOPE: Site Management and supervision
CLIENT: The Navigator Company
LOCATION: Setubal
DATE: July 2021
Site Fiscalization and Owners Engineer for a Bypass of Chlorine to be installed at Centro de Produção de Souselas (CPS).
SCOPE: Engineering and Design
CLIENT: CIMPOR
LOCATION: Souselas
DATE: August 2021
Support engineering services for a Gas Reduction and Metering Station (concept and execution phase) as Owners Engineer for a uncoated printing and writing paper and bleached eucalyptus pulp facility.
SCOPE: Engineering and Design
CLIENT: The NAVIGATOR Company
LOCATION: Portugal
DATE: March 2021
Survey of inlet and outlet expansion joints, as well as the respective ducts. The survey was carried out in two distinct phases, hot and cold cyclones. The surveys were done at CPS (Souselas Production Center).
SCOPE: Engineering and Design
CLIENT: CIMPOR
LOCATION: Portugal
DATE: September 2020
Flue Gas duct Stress Analysis study for a tie-in to the new Recirculation Gas Duct. The analysis performed is a static finite element analysis (FEA) to evaluate weld integrity or perform a fatigue analysis.
SCOPE: Engineering and Design
CLIENT: MECWIDE
LOCATION: Brussels
DATE: November 2020
7.2MW Photovoltaic Plant photovoltaic plant installed in Alcácer do Sal, Portugal.
PV plant planned to operate without feed-in tariff.
SCOPE: Site Management and Supervision
CLIENT: WARWICK
LOCATION: Portugal
DATE: August 2020
Feasibility Study and Project Development of a 100MW PV Plant for Project Financing Purposes.
Construction of Plant to be initiated in Q2 2021 in the Dominican Republic.
SCOPE: Technical Due Diligence and Basic Engineering
CLIENT: Natural World Energy
LOCATION: Portugal
DATE: September 2020
Engineering Licensing Package (Architectural, Civil, I&C and Electrical) for a Bypass of Chlorine to be installed at Centro de Produção de Souselas (CPS).
SCOPE: Engineering and Design
CLIENT: CIMPOR
LOCATION: Souselas
DATE: November 2020
3.4MW Photovoltaic Plant photovoltaic plant installed in Moura, Portugal.
PV plant planned to operate without feed-in tariff.
SCOPE: Site Supervision and Fiscalization
CLIENT: SOLAER
LOCATION: Portugal
DATE: June 2020
3D Laser Scan survey and Point Cloud treatment of leather tanning company for extension of production facilities purposes.
SCOPE: 3D Laser Scan Survey
CLIENT: Couro Azul
LOCATION: Portugal
DATE: June 2020
Calculation & Design for Exhaust Conduct of Steel Plant in Gent, Belgium, as well as detail and fabrication drawings.
SCOPE: Engineering and Design
CLIENT: MECWIDE – AMG Gent
LOCATION: Belgium
DATE: December 2019
Calculation & Design for Storage Tanks ASME VIII Div. 1 – ASME Boiler and Pressure Vessels Code to be installed in a Hydrocarbon Storage and Handling Terminal at Matola, in Mozambique.
SCOPE: Engineering and Design
CLIENT: GIMTL – GALP Matola
LOCATION: Mozambique
DATE: March 2019
Isometric Calculation & Design for 44.000 inches and Steel Structure design and detail drawings for 41.000kg to be installed at Neves Corvo mine in Beja, Portugal.
SCOPE: Detail Engineering
CLIENT: Mecwide, S.A.
LOCATION: Portugal
DATE: January 2019
FEED study of a Clinker Line Revamping with an addition of a Cogeneration Plant, at SECIL’s OUTÃO Cement Plant, Portugal.
SCOPE: Engineering and Design, Tender Negotiation, Contract Edition
CLIENT: SECIL, S.A.
LOCATION: Portugal
DATE: November 2018
46 MW photovoltaic plant installed in Ourique, Portugal. First utility scale PV plant planned to operate without feed-in tariff.
SCOPE: Site Supervision
CLIENT: Morning Chapter, S.A.
LOCATION: Portugal
DATE: July 2018
Fabrication drawings and detail design for Pumpboxes and Zinc Trommel to be installed at Neves Corvo mine in Beja, Portugal.
SCOPE: Detail Engineering
CLIENT: Mecwide, S.A.
LOCATION: Portugal
DATE: May 2018
Conversion of hydro-cyclones arrangement in zinc wash plant of Neves Corvo mines, Portugal, for increased operation efficiency.
SCOPE: Engineering and Design
CLIENT: Somincor, S.A.
LOCATION: Portugal
DATE: November 2017
Feasibility study of a PV installation for support of a irrigation system of two vineyards in Beja, Portugal, under an off-grid model.
SCOPE: Feasibility Study
CLIENT: J. Ramalho
LOCATION: Portugal
DATE: March 2017
Design and installation of a retractable screw conveyor for copper ore discharge, for automation of unloading activities.
SCOPE: Engineering and Design
CLIENT: SOMINCOR, S.A.
LOCATION: Portugal
DATE: January 2017
Design and stress analysis of a crude oil discharge line, in CLT – Companhia Logística de Terminais Marítimos, Sines, Portugal.
SCOPE: Engineering and Design
CLIENT: Mecwide, S.A.
LOCATION: Portugal
DATE: September 2016